Quicktron X MPE
MPE Smart Factory, specializing in the production of lighting products and electrical equipment, boasts an impressive annual production capacity of 100 million units, backed by a total investment of 2 trillion Vietnamese dong. Seeking cost-efficient and secure intralogistics, MPE aimed to embrace the lights-out factory concept, enabling 24/7 operations. Their goal was to automate material handling, enhance workplace safety, and simultaneously reduce labor costs.
Challenges And Objectives
MPE faced specific challenges and set clear objectives:
Lights-Out Factory Implementation: Transforming into a lights-out factory required seamless automation of material handling.
Enhanced Workplace Safety: Ensuring workplace safety was imperative.
Labor Cost Reduction: Reducing labor costs while maintaining efficiency was a key goal.
The primary objectives were to:
Achieve lights-out factory operations for round-the-clock production.
Enhance workplace safety through automation.
Realize substantial labor cost reductions.
Achieve a remarkable stacking accuracy rate.
Solution and Benefits
Quicktron, in collaboration with Linde, played a pivotal role in bringing MPE's vision to life. The fully automated factory utilized robots (AMRs) that navigated seamlessly using QR and RFID navigation, optimizing material handling efficiency. With a remarkable 99.99% stacking accuracy, these robots eliminated errors stemming from human factors. This round-the-clock operational system is redefining the logistics landscape, revolutionizing the industry with efficiency and reliability.
Complete Automation: An extensive 4000 square meter area was fully automated with 10+ Autonomous Mobile Robots (AMRs), Our robot system is seamlessly integrated with the ASRS system facilitating all ground movement of goods from one point to another seamlessly.
Labor Cost Savings: MPE achieved substantial cost savings, reducing labor costs by 60%.
Stacking Accuracy: Achieved an impressive stacking accuracy rate of 99.99%.
“Through the collaboration with Linde, Quicktron empowered MPE Smart Factory to fully embrace the lights-out factory concept, enabling seamless 24/7 operations, enhancing workplace safety, and delivering substantial cost reductions.”
MPE
Related Cases